Transdev - Rail Departure Request

This was a continuation of the Rail Departure System for KiwiRail. The passenger traffic was such that the platform indicators could not be seen when signalling occurred. They approached us and we designed an extension to the system which pulse an overhead blue light during the Train Departure Request command and then upon Clear to Depart the Blue Light would go steady. This blue light can be seen from one end of the platform to the other with clear visibility even with a full platform

The signalling lights are high intensity LED which unlike a strobe have an extremely long life span of some 50,000 hours continuous use.Hi Intensity LED Strobes

  • LED steady- and flashing beacon NES - 90 mm diameter
  • wide voltage range due to SMPS technique 24 - 48 V AC/DC, 110 - 240 V AC/DC
  • very good brightness - highest optical efficiency
  • specially designed and optimized lens/optics
  • up to date LED-technology
  • absolutely shock and vibration proof, maintenance free
  • long life time - 50.000h
  • low nominal current
  • inrush current limitation, EMC safe, leakage up to 3mA possible
  • modular design - mounting options horizontal, vertical and pole

 

Designed and Project Managed by Tec Smarts Ltd


 